AZE | ENG | RUS

Power transmission lines
Завершенные проекты

Completed projects

  • Construction of a 16.5 km 2-circuit power transmission line 110 kV between the substation Khyndiristan 110-Teze kend 130 and the substation 110/35/10 kV “Tezekend”
  • Construction of a 10 kV power transmission line with a length of 12.33 km. in Bilasuvar region
  • External power supply for a pumping station with a length of 4.32 km in Fuzuli region
  • Construction of a 2-circuit power transmission line 35 kV “Gabala 110 – Zaragan 35”
  • External power supply of a 2.0 km long pumping station in the Fuzuli region
  • Construction of a 2-circuit power transmission line 110 kV with a length of 47.6 km Ganja 330-Veisli 110 – Naftalan 110 and construction of a power transmission line 10 kV with a length of 7.8 km in the Goranboy region
  • Construction of a 2- circuit power transmission line 110 kV “Takhta Korpu” with a length of 14.8 km
    Construction of the 2nd circuit of the power transmission line 110 kV “Imishli-Agjabedi” with a length of 45.9 km.
  • Construction of a 10 kV power transmission line with a length of 6.8 km in Agjabedi region
  • Construction of a 2- circuit cable line 35 kV with a length of 4.7 km. in Agjabadi region
  • Construction of a 2- circuit power transmission line 110 kV 1-2 Zakatala-Chelebikhan with a length of 0.696 km
  • Construction of a 10 kV power transmission line with a length of 2.65 km in the Sheki region
  • Construction of a 6 kV power transmission line with a length of 2.035 km. in Mingechevir
 
  • Construction of a 1-circuit power transmission line 35 kV with a length of 7.1 km, power transmission line 10 kV with a length of 1.5 km, power transmission line 0.4 kV with a length of 7.1 km in the Barda region
  • Construction of 2-circuit power transmission line 35 kV Bakhramtapa-Sarkhanly with a length of 3.52 km.; Power transmission line 6 kV with a length of 4.56 km. and a 0.4 kV Power transmission line with a length of 21.84 km in the Imishli district
  • Construction of a 10 kV cable line with a length of 30.6 km, a length of 1.8 km. and a 0.4 kV cable line with a length of 23.4 km in the Mushvigabad settlement, Baku;
  • Construction of a 10 kV Power transmission line with a length of 3.45 km and a 0.4 kV cable line with a length of 9.83 km. in the Masazir settlement of Baku
  • Laying 14.2 km of cable from the substation 220/110/10 kV “Senye Qovshagi” to substation 110/10 kV in Masazir 
  • Construction of a 110 kV 2-circuit cable line (APvPu2g 1*500(g)/95-64/110) with a length of 14.2 km. and 2-circuit cable line 35 kV 1xXLPE-150/25 with a length of 2.68 km in Ganja
lep1
Supports of power transmission lines
Sumgayit city
s2_01b
Installation of 110 kV cable
APVP2Q 1x500(Q)/ 95-64/110 with the length of 14200 p/m
0000
External power supply
Installation of cables 110 kV APVP2Q 1x500(Q)/ 95-64/11C with the length of 14200 p/m