AZE | ENG | RUS

Сoast protection structures
Completed projects

In Salyan, Neftchala and Imishli regions the following work has been carried out:

• Raising and reinforcement of existing embankments along the river Kur and Araks – 20000 l/m

In Masalli region:
• Reinforcement of the waterway of Vilashchay river – 750 l/m

In Salyan region an earth dike was built with the length of 8.1 km during 2 months

The height of the dike was 4.1 m, the width of foundation – 21.0 m, in the upper part – 8.0 m.

s4_01a
Reinforcement of the waterway of the Vilashchay river
City Masalli
s4_01b
Earthwork and reinforced concrete works
s4_01c
Earth dike
Salyan region