AZE | ENG | RUS

Utility system, public services and amenities and other works
Завершенные проекты

Completed projects

In Baku:
• construction of the main water pipeline 152 Alatava Reservoir – Center of Hand Games
• construction of the Hovsan sewerage
• on the territory of the former house-building facility, the entire range of preparatory work for construction and engineering support for the building block
• engineering support of the Mushvigabad settlement under construction

in Ganja:
• engineering support of the new development quarter 

in Mingachevir:
• engineering support of the new development quarter

in the Absheron region:
• reconstruction of the pressure network of the Khirdalan sewage pumping station
• engineering support of the Masazir settlement under construction

in Aghdam region:
• construction of a power supply network for the settlements “Dordyol-1” “Dordyol-2”and Tezekend
• construction of a water supply system and power grid of the Guzanly settlement under construction

in Barda region:
Construction of heating system and external and internal power supply network of Hasanqaya settlement

in Agjabadi:
• heat supply of a residential area

Untitled-3b

in Beylagan region:
Reconstruction of power supply network in the settlement Mil

in Goranboy region:
• Reconstruction of power supply network in the village Ergach
• engineering support of the new development quarter  in the town Goranboy

in the city Yevlakh:
• engineering support of the new development quarter

in the region Kurdamir:
• Construction of power supply network in the village  Pirili

in the region Tartar:
• Reconstruction of power supply

s6_01a
Hovsan sewage system
s6_01b
Main water line Alatava 152
s6_01c
Construction of residential quarter